S106 Acceptance – Storm and Foul Water Drainage Design – Northern Roots, Oldham
As part of a planning application for a new Forestry Skills Centre and Workshop located at Northern Roots Oldham, we were instructed to progress with designed both the Foul and Storm Water drainage system for the whole site.
The design of the Storm Water System had a heavy focus from our client to implement various Sustainable Urban Drainage Features (SuDs) to provide water quantity, quality and amenity. As such, our design included 2 ponds, multiple swales and ditches across the whole site and throughout the full length of the system.
Following co-ordination with our client and the project team, a Section 106 application was submitted and accepted by United Utilities for our proposal to be connected into their adopted system, ticking off a key condition outlined in the decision notice.
