Friday 20 October 2017 saw the opening of the first phase of Liverpool Shopping Park.
Sanderson Associates (Consulting Engineers) Ltd has worked closely with The Derwent Group and the design team for a number of years to provide all highway and drainage related design from conception to completion and would like to congratulate everyone involved for all their efforts in delivering this fantastic development.
The central plaza of LSP contains an 11m high Meccano sculpture of an iconic Liver Bird reflecting the previous occupation of the LSP site as the first manufacturing base for Meccano. The foundation design for the sculpture was undertaken by Fairhurst Leeds.
Several key retailers opened their doors to shoppers on the initial day of trading. Car park layout/drainage design and pedestrian routing was undertaken by Sanderson Associates.
In 2026, Aaron started at Sanderson Associates as an Apprentice Transport Planner, joining our Traffic and Transportation team. After studying 3D Design, Digital Media Design and Criminology at A-Level, his […]
In 2025, Jamie began her career with Sanderson’s/Fairhurst after completing two years at college studying History, Sociology and Photography. Although her studies were not directly engineering-related, she had always been […]
We are pleased to announce the successful completion of our work in support of a proposed Petrol Filling Station development in Gargrave, North Yorkshire. Sanderson Associates (Consulting Engineers) provided specialist […]